Residential & Commercial
United Arab Emirates
Dubai
2009
This project is a “Fully Automated Solutions” project executed for Seven Tides Limited in 2009. MAG Royal Solutions managed the full installation, operation and maintenance of this project.
| Floor | Size | Height | Levels | Numbers |
|---|---|---|---|---|
| GF | 2310m2 | 3m | 1 | 66 |
| Level 1 | 2310m2 | 3m | 1 | 66 |
| Level 2 | 2310m2 | 3m | 1 | 66 |
| Level 3 | 2310m2 | 3m | 1 | 66 |
| Level 4 | 2310m2 | 3m | 1 | 66 |
| Level 5 | 2310m2 | 3m | 1 | 66 |
| Total | – | 18m | 6 | 396 |
| Shortage | – | 765-396 | 6 | 369 |
DETAILS & SPECIFICATIONS
Parameters
G+5 floors Parking.
Floor area: 77m x30m= 2310m2.
Height 18m.
Number of parking required: 765 car spaces.
| Type | Size | Height | Levels | Numbers |
|---|---|---|---|---|
| FAS 1000 | 2310m2 | 18m | 7 | 765 |
To compensate the shortage to introduce the Fully Automated Parking System FAS 1000. The new set-up is as follows – please refer to the image.